Quality control. As part of a quality control process for computer chips, an engineer at a factory randomly samples 212 chips during a week of production to test the current rate of chips with severe defects. She finds that 27 of the chips are defective.
-
What population is under consideration in the data set?
-
What parameter is being estimated?
-
What is the point estimate for the parameter?
-
What is the name of the statistic we use to measure the uncertainty of the point estimate?
-
Compute the value from part (4) for this context.
-
The historical rate of defects is 10%. Should the engineer be surprised by the observed rate of defects during the current week?
-
Suppose the true population value was found to be 10%. If we use this proportion to recompute the value in part (5) using instead of , does the resulting value change much?